All news


Calenberg is part of the 23rd BIBM Congress 2021 in Copenhagen

BIBM is the major precast concrete industry platform which can deal with European-wide issues.
Focus of the upcoming BIBM Congress will be on The Future of European Construction - Precast Excellence in Nordic Countries.
10/11/2021

ICCX Western Europe 2021

We are looking forward to your visit on 03 and 04 November 2021 at the Maritim Hotel in Bonn.
02/11/2021

Masaryk Project, Prague

An impressive new building is being constructed in the centre of Prague: the multifunctional complex Masaryk Center, designed by the famous architect Zaha Hadid. The building complex, which is scheduled for completion in 2023, is located in the immediate vicinity of the historic Masaryk railway station.
10/09/2021

That was the DAGA 2022

At this year's annual conference for acoustics, Calenberg presented the new Cisador® and Ciflex type series in the product area of vibration isolation, which was followed by a lively exchange with interested visitors.
10/09/2021

DAGA 2021 in Vienna

Are you excited about DAGA this year? What are you looking forward to the most? The 47th Annual Conference will take place at the Messe Wien Exhibition & Congress Center starting 15-18 August.
27/07/2021

NEW PROJECT: VIBRATION ISOLATION OF MULTI-FAMILY HOUSES IN BAD VILBEL

The apartment houses need to be decoupled elastically to protect the residents from immissions from vibrations and secondary airborne noise caused by adjacent rail traffic.
01/07/2021

NEW: CIDYN CALCULATION TOOL FROM CALENBERG

Our calculation tool supports planners, plant engineers and architects in selecting the optimum vibration-isolated solution with elastomeric bearings.
06/05/2021

EXTENSION OF TRAM LINE IN AUGSBURG WITH ELASTIC EPDM RAIL PADS

Installation and integration of the Calenberg elastic EPDM Rail Pads into the RHEDA CITY G ballastless track system.
30/04/2021

SHOPPING CENTRE CANO IN SINGEN: THERMAL SEPARATION WITH COMPACT CORE BEARING

ECE opens the Cano inner-city shopping centre in Singen after two and a half years of construction. The main structural features include a 16,000m² sales area on three levels and around 500 parking spaces on two floors above the sales levels.
20/04/2021

Happy Easter!

Calenberg wishes you all a Happy Easter with sunshine and a basket full of chocolate!
01/04/2021
1
...
5 6 7 8 9 10 11 12 13 14