7 / 121


07/12/2023

News from the railway project in China


Together with our Chinese partner Tiantie Group, the second stage of the extension of a metro line through a densely built-up area was completed.

Calenberg's Cisilent® type G noise barrier, which was originally designed for use along high speed railway lines, was used, now securing people as a low noise barrier close to the track along the metro line. Our partner Tiantie was responsible for the planning and approval of the installation and carried out the assembly.
Thanks to our partner Tiantie for the successful realisation.

Check out these interesting details:

  • solid carriageway on a bridge-like structure
  • curved track layout with a radius of 400 m
  • low vibration track with short sleepers
  • rail type 60 kg/m with rail fastening type WJ-2